1,840 Days · No Lost-Time Incidents
Industrial Mechanical Contractor

Precision-
Installed.
Exposed to
Proof.

Laser-aligned to thousandths of an inch. Certified crews. Documented outcomes on every project from single-pump replacements to full plant relocations.

±0.001″

Alignment Tolerance

35+

Plant Turnarounds

24/7

Emergency Response

CERTIFIED MILLWRIGHT • NCCER •
Millwright crew performing precision laser alignment on industrial turbine shaft in a manufacturing plant
Live Alignment Reading

Horizontal

+0.0003″

Vertical

−0.0001″

Within Spec
Laser Shaft Alignment
Turbine Installation
Conveyor Rebuild
Precision Grouting
Millwright Rigging
Gearbox Overhaul
Pump & Motor Alignment
Foundation Prep
Shutdown Maintenance
Capital Project Install
Laser Shaft Alignment
Turbine Installation
Conveyor Rebuild
Precision Grouting
Millwright Rigging
Gearbox Overhaul
Pump & Motor Alignment
Foundation Prep
Shutdown Maintenance
Capital Project Install
Project Documentation

Every project,
three acts.

Industrial millwright crew rigging heavy gearbox with chain hoists in pulp mill under fluorescent lighting
Emergency ShutdownPulp & Paper

Seized Gearbox — 72-Hour Turnaround

Problem

A 400-ton kraft pulping line seized at 2 a.m. on a Monday. The gearbox had spun a bearing and scored the housing. Unplanned downtime was costing the mill $18,000/hour.

Method

Our crew rigged the 6.2-tonne gearbox out with strand jacks, machined the housing in-situ with a portable boring bar, pressed new bearings, and re-installed with laser alignment verified to manufacturer tolerances before the day shift arrived.

Result

Line back online in 68 hours. Alignment verified at ±0.0005″ across all planes. Zero repeat failures in 14 months of follow-up.

6.2 t

Tonnage Handled

±0.0005″

Alignment Tolerance

6 Journeymen

Crew Size

68 hrs

Turnaround

Close-up of precision dial indicator mounted on turbine coupling for shaft alignment measurement
Annual TurnaroundPower Generation

Steam Turbine Drive Train Realignment

Problem

A 180 MW combined-cycle plant had been running 0.008″ out of parallel on the turbine-generator coupling for two scheduled outages. Vibration was trending upward — bearing replacement was becoming quarterly.

Method

Installed reverse-indicator dial brackets, mapped thermal growth across four operating temperatures, calculated cold-offset targets, and shimmed the generator to bring the drive train within 0.0015″ of true at operating temperature. Documented every reading with time-stamped data logs.

Result

Vibration amplitude down 61%. Bearing interval extended from 90 days to 18 months. Plant accepted our alignment report as the new baseline standard.

180 MW

Unit Size

±0.0015″

Final Tolerance

4 Journeymen

Crew Size

11 days

Outage Window

Heavy machinery installation at mining site with crane rigging large mill shell onto concrete foundation
Capital ProjectMining

Greenfield SAG Mill Foundation Install

Problem

A new copper concentrator needed a 28-tonne SAG mill set on a 3.2 m elevated concrete foundation. The civil contractor delivered the anchor bolts 3 mm out of pattern — 6 days before the mechanical crew's mobilization window.

Method

Core-drilled and re-epoxy-anchored four of twelve bolts to correct the pattern, laser-levelled the sole plates to within 0.002″ over a 4.8 m span, set the mill shell in two sections with a 500-tonne mobile crane, and grouted with high-strength non-shrink. All work inspected by the owner's QA engineer on site.

Result

Handover 2 days ahead of revised schedule. Foundation survey showed zero settlement after first 90 days of operation. Retained for Phase 2 ball mill installation.

28 t

Tonnage Set

±0.002″/4.8 m

Level Tolerance

9 Journeymen

Crew Size

2 days early

Schedule

Industrial conveyor belt system in manufacturing facility with overhead lighting showing belt and pulley assembly
Conveyor ResurrectionManufacturing

Overland Conveyor System — Overnight Rebuild

Problem

A head pulley bearing failure took down a 340 m overland conveyor carrying automotive stampings between two press buildings. Second shift was idled. Production scheduled to resume at 6 a.m.

Method

Mobilized a 3-man crew at 10 p.m. with a pre-staged bearing kit. Removed the head pulley assembly, pressed new spherical roller bearings with a hydraulic puller set, checked pulley lagging, re-installed and laser-aligned the pulley to the carry idlers, tensioned the belt, and ran a no-load test before handing back to maintenance.

Result

Conveyor running by 4:45 a.m. — 75 minutes before first shift. No lost production. Client added us to their approved emergency maintenance roster.

340 m

Conveyor Length

Spherical Roller

Bearing Type

3 Journeymen

Crew Size

6.75 hrs

Turnaround

What We Do

Built for
zero-tolerance
environments.

Every scope we take on is backed by journeyman-certified crews, documented procedures, and a tolerance report you can hand to your QA engineer.

Laser Shaft Alignment

Reverse-indicator and laser optics on pumps, compressors, turbines, and drive trains. Every job delivered with a signed alignment report.

Tolerance: ±0.001″

Precision Rigging

Strand jacks, hydraulic gantries, and engineered lift plans for equipment up to 500 tonnes. Every critical pick engineered and documented.

Capacity: 500 t

Planned Shutdowns

Scope management, crew mobilization, and multi-discipline coordination for annual turnarounds in pulp & paper, mining, and power generation.

Response: 24/7

Capital Project Install

Greenfield and brownfield equipment setting, sole plate levelling, precision grouting, and foundation acceptance testing for new facilities.

Grouting: Non-shrink certified
By The Numbers

Numbers plant
managers trust.

Every metric on this page is pulled from project documentation, not marketing copy. Ask us for the underlying reports.

0

Craft Hours Logged

Last 12 months, all sites

0+

Plant Turnarounds

Pulp, power, mining, manufacturing

0t

Max Rigging Capacity

Engineered lift plans included

0

Days Without LTI

Lost-time incident free

Project Photography

The work,
documented.

“They handed us an alignment report before we even asked for it. Every measurement, every shim, every timestamp — exactly what our insurer needed.”
David ReinholtMaintenance Director · Cascadia Pulp, BC

2012

Established

24

Journeymen on Roster

4.9

Client Satisfaction

800+